NO765MN

Our Land

Our Voice

A coalition of Minnesota farmers, landowners, municipalities, residents and local governments standing together against the proposed 765kV transmission line.

Upcoming Event:

Town Hall: No765MN

Preston MN, Oct 21 6-8pm

What is the “765”

The 765 kV is a the largest transmission line ever proposed in the upper Midwest. Stretching from the South Dakota border, this line is proposed to cross the entire of MN along the southern edge with a possible ‘bump’ north to Rochester, then dive south through the driftless region and the upper Mississippi wildlife refuge to Wisconsin. 765,000 volts is a massive transmission line. This line will carry six times capacity of a 345 kV line. Right of Ways will need to be expanded to 250 feet wide and 150-200 foot steel lattice towers will carry this line, spaced 1,000-1500 feet apart.

Utilities have divided their project into 2 segments

  1. Power On Midwest (Minnesota PUC EDocket 25-117)

  2. Gopher to Badger Link (Minnesota PUC Edocket 25-121)

Map of the proposed route.

OUR LOSS

A permanent industrial corridor through working land.

For the families who own land in the corridor's path, some would sell and move at considerable loss. Many more would live with steel towers 150–200 feet tall — the height of a 15-to-20-story building — plus view-shed disruption, noise, electromagnetic-field concerns, and ecological damage on parcels worked for generations.

The damage reaches past the right-of-way: tourism, property values, trout streams, threatened species, burial mounds.

THEIR GAIN

Private return. Public bill.

The line is part of a regional plan by MISO. Of the companies developing the two lines, only Dairyland Power Cooperative is member-owned. The rest are private, for-profit firms that earn a regulated return on a multi-billion-dollar build. Minnesota ratepayers bear the cost.

Five state utility commissions have already filed a formal complaint at federal regulators challenging the math.

SOURCE · FERC DOCKET EL25-109 · JULY 30, 2025

CORRECTION · SEPTEMBER 25, 2026 · AN EARLIER VERSION COUNTED FOUR PRIVATE DEVELOPERS. THAT COUNT LISTED GRIDLIANCE HEARTLAND AND ITS PARENT COMPANY, NEXTERA ENERGY TRANSMISSION, AS TWO COMPANIES. SOURCE · MARIBELL TRANSMISSION PROJECT

NO NEED

The math doesn't add up.

Minnesota’s electricity use has been flat to declining for twenty years. And MISO's own independent watchdog estimates that for every dollar ratepayers would spend on this line, it returns less than 40 cents in benefits — the lower energy costs that are supposed to justify it. MISO claims $1.80–$3.50.

The corridors are not designed to deliver power to the communities they cross — and the data-center projects driving recent demand forecasts are separate proposals in separate proceedings.

SOURCES · EIA-861 · POTOMAC ECONOMICS (MISO IMM), FERC DOCKET EL22-83-000

About No765MN.

We are farmers, landowners, and multi-generational stewards of this land. We believe the applicants have not proven need for this project, that better alternatives exist, and that our voices deserve to be heard before permanent decisions are made.